会员登录
请登录您的生意号,获取电子名片。便于转发分享!
取消

Wuhan HiRail Transportation Technology Co., Ltd.

会员登录
请登录您的生意号,获取电子名片。便于转发分享!
取消
Rail fastener installation status checker (iRC)
Rail fastener installation status checker (iRC)
Rail fastener installation status checker( iRC ) is our independent research and development of the first set of fastener system automatic detection equipment. It can quickly detect and analyze the fastener system fastening state, spring bar installation state, component defects, thickness of backing plate, left and right positions of rail and rail bearing platform, clearance between longitudinal limit convex platform and rail bottom of WJ-7 type iron backing plate, etc. It can realize real-time alarm of fastener system disease and visual output of detection results.

System parameters

No.

Item

Indicators

1

Detection speed

0~10km/h

2

Tighten state

±0.1mm

3

Installation status of spring bar

(Error detection rate)<2%

(Leak detection rate)<2%

4

Parts defect

(Error detection rate)<2%

(Leak detection rate)<2%

5

Plate thickness

±0.5mm

6

Left and right position of rail and rail bearing platform

±0.5mm

7

Clearance between longitudinal limit boss and rail bottom of iron backing plate

±0.5mm

8

Detection speed

0~10km/h

9

Continuous working time

>4h

10

Test mode

General survey

11

Working temperature

(-20~50)℃

12

Equipment weight

about 30kg


Data achievements